Get 50% Flat Discount on This Special Offer | Limited Time Offer - Ends In COUPON: SAVE50

Practice Exin CDCS Exam Questions

Page: 1/12
Total 60 Questions
Question No 1
Management has requested a 15 - minute battery bank assuming full load on the UPS. The UPS vendor has provided the following specifications of the UPS • Rated power 30 kVA • Rectifier input voltage 400 V/3 phase • Rectifier input power factor 0.8 • Battery rated voltage 384 V • Number of cells 192 • End of discharge voltage 308 V • Inverter output voltage 400 V/3 phase • Inverter output power factor 0.8 What information is missing to perform the battery calculation?
Choose the Choices:


Question No 2
The pipes of a VESDA smoke detection system are installed at the air intake of the air conditioner inside the computer room. Is this a good practice from an early smoke detection point of view?
Choose the Choices:


Question No 3
You need to determine the strategy for the cooling audit. All the servers are based on a front - to - rear (F - R) airflow design. Which location for the temperature/humidity measurement should you recommend for the audit?
Choose the Choices:


Question No 4
You are installing new copper cabling. What is the advantage or disadvantage of choosing pre - terminated category 6 or 6A cabling?
Choose the Choices:


Question No 5
When are the wet bulb and dry bulb temperatures identical?
Choose the Choices:


Page: 1/12
Total 60 Questions