The following screen displays order details in a client’s order system application. An order is entered
into the Order number field and the details for that order are displayed. There is a requirement to
read the Product code value from the resulting display. The Product code will vary between orders.
The Product Code label has been successfully spied and the following attributes have been returned:
The Product Code value field has been spied and the following attribute set has been selected:
In order to ensure a consistent match for the Screen Text – Product Code element, which of the
following statements must be considered:
1. The Dynamic value of the Y attribute for the Screen Text – Product Code element must be derived
from the Y attribute of the Label – Product Code element
2. The Y attribute of the Label – Product Code element cannot be derived as it is not checked
3. The Y attribute for the Screen Text – Product Code element must be set to a Match Type of ‘Equal’
4. The Window Text attribute for the Screen Text – Product Code element must be set to a Match
Type of ‘Wildcard’
5. The Window Text attribute for the Screen Text – Product Code element must be un - checked
Question No 2
Which of the following Application Models follow Blue Prism Best Practice:
Question No 3
Which of the following four configurations depicts the best approach for an Action that has been
built to select a button to navigate to an Input Order screen?
Question No 4
2
A Process Definition Document, for a new process to open ISA accounts, specifies that the value
“2008 Cash ISA” is to be entered into the Product Selection field of the following screen:
The Product Selection field is a drop down menu with the following options available:
According to Best Practice, which of the following design options are correct for populating the
Product Selection field with the value 2008 Cash ISA:
Question No 5
3
A Process is fed cases to work from a spreadsheet held in a shared drive. The location of the shared
drive is different between Development and Production environments. How should this be
managed?